Pengumuman! Cek Eligibilitas Magang Nasional Batch 3 Tahun 2026 Sudah Dibuka. Segera cek status kelayakan Anda melalui akun Maganghub.

Harapan Utama Prima
Membekali peserta dengan kemampuan dasar dalam mendukung administrasi dan operasional proyek telekomunikasi, mulai dari project initiation, document administration, site tracking, progress monitoring, reporting, coordination, hingga project closing.
Materi: Pengenalan perusahaan dan struktur organisasi Pengenalan divisi Project/BU Peran Project Admin Alur komunikasi dalam project Pengenalan PIC dan stakeholder Output: Organization & Project Structure Daftar PIC/Stakeholder Week 2 – Basic Telecommunication Materi: Basic telecommunication BTS/Site RAN 4G/5G Transmission Microwave Fiber Optic IPRAN CME Installation & Integration Output: Basic Telecom Terminology Glossary istilah project Week 3 – Project Lifecycle Memahami alur: Planning → Survey → Material → Installation → Integration → Testing → Acceptance → Closing Output: Project Flow Chart Week 4 – Basic Project Administration Materi: Project database Site list Work Order BOQ Project target Timeline PIC Document filing Output: Sample Project Database Project Administration Checklist
Week 5 – Document Management Materi: Jenis dokumen project Document naming Folder structure Document numbering Document status Revision control Output: Project Folder Structure Document Register Week 6 – Document Tracking Peserta belajar melakukan tracking terhadap: Document submission Approval Revision Outstanding document Document completion Output: Document Tracking Sheet Week 7 – Site Database Management Membuat database: Site ID Site Name Area PIC Status Progress Target Date Output: Site Database Week 8 – Data Accuracy & Validation Materi: Data checking Duplicate data Missing data Data consistency Data validation Update database Output: Clean Project Database Data Validation Checklist
Week 9 – Excel Basic Materi: Formatting Sort & Filter Freeze Pane Table Data Validation Conditional Formatting Output: Project Tracking Sheet Week 10 – Excel Formula Materi: IF COUNT COUNTA COUNTIF SUMIF VLOOKUP XLOOKUP IFERROR Output: Automated Project Tracker Week 11 – Pivot Table & Dashboard Materi: Pivot Table Pivot Chart Basic dashboard Progress summary Output: Project Dashboard Week 12 – Project Progress Monitoring Peserta melakukan monitoring: Target Actual Completed On Progress Pending Outstanding Delay Output: Weekly Progress Report Progress Dashboard
Week 13 – Project Coordination Materi: Internal coordination Coordination dengan engineer Coordination dengan supervisor Follow-up vendor Follow-up outstanding Output: Action Item Tracker Week 14 – Meeting Administration Peserta belajar: Menyiapkan meeting Membuat agenda Mencatat meeting Membuat Minutes of Meeting (MoM) Follow-up action items Output: Meeting Agenda MoM Action Item List Week 15 – Issue & Outstanding Management Jenis issue: Technical Material Site Permit Vendor Customer Document Output: Issue Tracker Outstanding Tracker Week 16 – Weekly & Monthly Reporting Peserta membuat: Daily report Weekly report Monthly report Progress summary Outstanding summary Output: Weekly Project Report Monthly Project Report
Week 17 – Site Implementation Documentation Mengenal dokumen: Site Survey Installation Checklist Site Photo As-Built Testing Report Integration Report QC Checklist Output: Site Document Checklist Week 18 – Quality & QC Administration Materi: QC documentation Defect Punch List NCR Corrective Action Re-inspection Output: Punch List Tracker QC Document Tracker Week 19 – Acceptance Process Memahami alur: Installation → QC → Testing → ATP → PAC → FAC → BAST/MO Peserta belajar melakukan monitoring status acceptance. Output: Acceptance Tracker Week 20 – Project Closing Administration Materi: Outstanding closure Final document Final site list Acceptance completion Project archive Handover document Output: Project Closing Checklist Final Document Register
Week 21 – Final Project Planning Peserta diberikan simulasi: Project Rollout – 50 Sites Peserta bertugas sebagai Project Admin. Membuat: Site database Project timeline PIC list Document register Progress tracker Week 22 – Project Monitoring Peserta melakukan simulasi monitoring: Site progress Document progress Installation QC Testing Acceptance Outstanding Output: Integrated Project Tracker Week 23 – Reporting & Closing Peserta membuat: Weekly report Monthly report Dashboard Outstanding report Acceptance report Closing report Output: Final Project Dashboard Project Closing Report Week 24 – Final Presentation & Assessment Peserta mempresentasikan: Project Overview Project Scope Site Database Project Progress Document Status Issue & Outstanding Acceptance Status Dashboard Project Closing Lessons Learned
Alamat: B3 and B4, Jl. Duren Tiga Raya No.101 Kav.A3,A4, RT.6/RW.1, Duren Tiga, Kec. Pancoran, Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta 12760

Kota Adm. Jakarta Selatan

Biro Umum, Sekretariat Utama (Depok, Jawa Barat)
Kesehatan Gigi dan Mulut, Kesehatan Gigi, Keperawatan Gigi
Rasuna Residence Development
Tata Boga, Perhotelan, Pendidikan Tata Boga, Manajemen Perhotelan dan Pariwisata, Pengelolaan Perhotelan
Tljo Asset Management
Bisnis Perhotelan, Perhotelan, Manajemen Perhotelan, Manajemen Perhotelan dan Pariwisata
Jakarta Pakar Kardia
Gizi dan Dietetika, Gizi Klinik

PT. Visi Utama Indonesia
Tata Boga, Perhotelan, Seni Kuliner, Manajemen Kuliner

PT. Prana Nadi
Tata Boga, Hospitality dan Pariwisata, Manajemen Pariwisata